FAQs

Commercial gate questions, answered straight

What facility managers, general contractors, and property teams ask us most — about compliance, sizing, lead times, and what a gate costs to keep running.

UL 325 entrapment protection
Photo eyes, safety edges, and a ground loop covering each entrapment zone on a powered gate.
Questions

Everything we get asked

Do you do residential gates?

No. We are a commercial gate contractor — industrial yards, warehouses, multifamily, municipal, and secured sites. Keeping to commercial work is why we can carry the certifications, the insurance, and the parts stock this work needs.

What does the site survey cost?

Nothing. We measure the opening, shoot the grade, check side room and overhead clearance, and go through traffic and credentials with you. You get a written scope you can put out to bid, whether or not you use us.

How do I know which gate type our site needs?

Four things decide it: side room beside the opening, the grade of the drive, overhead clearance, and traffic. Cantilever where there is run-back, swing where there is level arc, vertical pivot where there is neither, barrier where the job is throughput.

What is UL 325, and does it apply to us?

UL 325 is the standard covering powered gate operators and their entrapment protection. ASTM F2200 covers the gate itself. If your gate is automated, both apply, and after an incident they are the first thing asked about.

Is our existing gate still compliant?

It may not be, even if it was on the day it went in. Photo eyes drift out of alignment, safety edges get clipped by delivery trucks, and sensors get disabled when they nuisance-trip. We inspect and report in writing.

How is the operator sized?

On three numbers taken at the survey: the weight of the leaf, the cycles per day, and the wind exposure of the site. An operator specified to hit a price rather than carry the leaf is the most common cause of failure we are called to.

What happens to the gate in a power cut?

That should be a deliberate decision, not a default. Battery backup keeps it running for a defined number of cycles; fail-safe configuration releases the gate to open. We ask which you want.

Will the gate open for fire and EMS?

It must, and how depends on your local department. Knox box, strobe detection, or a dedicated input are the usual options. We confirm with your fire department before the scope is finalised.

Do you service gates another contractor installed?

Yes, any commercial make. Tell us the manufacturer and rough age of the operator when you call so we can bring likely parts on the first visit.

How long does a commercial gate installation take?

Most run one to three days on site once materials arrive, plus footing cure time. Lead time on the gate and operator is usually the longer part, and we give you both figures in the written scope.

Do you work with general contractors and architects?

Regularly. We can work to an issued specification or write the gate and access-control scope at design stage, which avoids the clashes that appear when a gate is specified without a site survey.

What areas do you serve?

Eastern Massachusetts and Southern New Hampshire, from our yard at 418 South St., Tewksbury, including Lowell, Andover, Chelmsford, Billerica, Haverhill, Nashua, and Salem.

Site survey

Request a site survey

Send the opening width and what the site has to do, and we’ll call to book a survey. Prefer to talk now? Ring (617) 501-7139 and you’ll reach a person, not a phone tree.

  • No cost, no obligation, no pressure
  • Written scope you can put out to bid or hand to a GC
  • Most replies inside one business day
UL 325 entrapment protection
Photo eyes, safety edges, and a ground loop covering each entrapment zone.

A rough number is fine — we confirm on site.

Ready when you are

Still have a question?

Free site survey, a written scope you can put out to bid, and crews who commission what they install.